Sunday, 25 May 2014

'And if you gaze for long...'

We had become almost used to the occasional pungent eggy smell outside the back of the house. While working on rebuilding the steps to the garden, Lin said “Clear some of the Canna lilies next to the wall. Cut back the Yucca. Let’s see what’s there.”
From a space around the roots of the cleared plants that was hardly half a cubic metre, I dug out, with spade, trowel and hands, a mess of black damp earth mixed with plastic bags, plastic cups and empty water bottles – debris that had drifted off through an 18 inch alley between our wall and the neighbour’s apothiki, escaping into our garden beneath a rusty iron mesh laced with chicken wire.
The abyss

With bolt cutters I removed the skirting of this ineffectual barrier; found a tighter strip of mesh from our inventory of might-be-useful odds-and-ends, and between us fashioned a more effective barrier to block debris from the gully. The rubbish cleared, we found the source of the smell – a noxious black trickle that must have been escaping from our neighbour’s soak-away - foul water that had impregnated the rubbish I'd removed and bagged, making the smell from the leak even worse.
Do we mention this to our neighbours? Dilemma. The leakage is into our space and we have no wish to complicate a near perfect relationship. Better to sort it out and then perhaps mention 'a little problem' we've sorted.
“Yes. Let’s leave it for the moment. See if the leak can be sealed”
Using the hose at high pressure, Lin swashed out the concrete-floored space below the gully and swept it down the pipe we’d laid several years ago – in place of an open ditch - to take our washer water out of the garden.
She set to lining the cleared space with a concrete screen walled with pieces of marble. The difficulty was to find a moment in the day when no water was run from sink, loo, washer, or shower from next door. Mid-siesta seemed best. For three days Lin worked at it, abandoning the steps project. It was clear that the leak, if stopped in one place, would make another way through the porous bricks and mortar of our shared garden wall.
“You know what? They have concrete all round the other three sides of the soak-away but they've left the wall between the two gardens as the fourth side”
Lin left a small space at the foot of her lining to allow the leak to continue, as she blocked up other potential holes and cracks in the wall with cement, including ones above the water level “from which I suspect some of the miasma escapes”.
How to stop the final trickle? I bought some quick drying cement. During what seemed a hiatus in water usage Lin applied the mix to the lowest leak. The work had  dried in minutes. The result looked good; the space clean and smooth. Already the smells seemed to have lessened, as though the blocking operation was ensuring that the porous wall was filtering out the worst effects of the leak. Next morning Lin inspected.
“Oh no! It’s still leaking”
“We must get more quick drying cement. But Lin, it doesn’t smell nearly as bad now”
“That’s probably just luck”
She was disappointed.

Monday, 21 May 2007

E-mail from Corfu

Hi Simon, Linda. I had an idea to cover the drain totally with plaka after we discovered the smell. I am sure the smell is from a broken pipe leaking into your garden down the wall into the drain. I do not think a reed pond could cope with sewage. This would make a nice step up to the garden area. At a later time I thought we could build the reed pool on top of the plaka, next to the steps. This would take the form of three pools, trickling into each other and finally any excess water would be channelled into the drain and go out with whatever smelly water comes into the drain. No problem with the beam being covered with plaster. Monday sees the final part of the old wall come down. The new one has been bricked up, and M and B are making a jig for the arch. The curve has been measured as follows, try it on a bit of paper if you like. Measure downwards 38cm at 1cm intervals. Measure across the top 114cm at 3cm intervals. Number downwards 38-1, and across the top from left 1-38. Joint 1 to 1, 2 to 2 etc, and you will end up with a curve. Repeat on other side if you have space. Will show picture of jig as soon as it is built. Have receipts for euros, and still have marble and varnish to purchase. Will get down to big paintshop near airport to see if they sell the required varnish. Found mess of electric cable in thin wall when we took it down. Not connected to anything, may have been old mains supply into building. Will be cutting floor and stairwell Monday or Tuesday, then replacing odd planks and sanding. Will follow instructions from web site re vacuum clean and white spirit etc. Best regards, G, M & B Hi G. Thanks for the update. Sounds like everything's coming together. Re. money, I reckon the marble and varnish will cost about €150-€200. I can't buy this amount from the currency firm - they're not interested in less than €1000. Has anyone got a sterling account based in England that I could put the extra money into? Not sure about the plaka ideas. They sound great, but we're a bit strapped for cash and will be for some time. I don't think we're going to be able to afford any extra work for a while. Anyway, I think we should try to work out where the smell is coming from. We'll have to do some investigation when we come in September. We'll have a think about the plaka over the drain and I'll e-mail again to let you know what we think. Really wish we could be there to see the work in progress. Can't wait. September seems ages away, but it's only about 15 or 16 weeks. Regards to all. Lin & Simon [The alternative to sending cash via an exchange company which is not interested in sums below £1000 is through an agency like Western Union who require a fee of nearly £50 to send someone a sum of say £250]